ADVERTISEMENT
  • Home
  • About us
  • Contact us
Friday, December 5, 2025
TheScript Nigeria
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
TheScript Nigeria
No Result
View All Result
Home Press Release

TCN Restores the National Power Grid after System Disturbance

thescript by thescript
July 21, 2022
in Press Release
0 0
0
TCN Restores the National Power Grid after System Disturbance
0
SHARES
7
VIEWS
Share on FacebookShare on Twitter

The Transmission Company of Nigeria (TCN) wishes to inform the general public that the national grid experienced system disturbance at about 11.27am today, 20th, July 2022. The incident was a result of sudden drop in system frequency from 49.94Hz to 47.36Hz, which created system instability.

According to reports obtained from the National Control Centre (NCC), it was precipitated by the tripping of a Unit (with a load of 106 MW) in one of the generating stations due to “Exhaust over Temperature”. This unwholesome event, which pulled out other grid-connected Units in the plant, resulted in aggregated generation loss of 457MW. In its wake, a train of events ensued – culminating in the collapse of the national grid.

As obtainable in all systems, when a component of the electric power system is defective, the entire configuration is vitiated. However, inspite of setbacks encountered at the initial stage, grid restoration had almost been completed as at 11:00pm when this report was filed.

The Nigerian Electricity Supply Industry appreciates the kind understanding of Government and consumers of electricity within and outside the country. We are committed to leveraging the concerted interventions instituted thus far to enhance power supply reliability so that the issue of system collapse will soon become a thing of the past. Meanwhile, a full-scale investigation is being conducted to establish the cause of this failure.

Ndidi Mbah
GM (Public Affairs)
20/07/2022

Recommended

CBN

CBN releases N607bn agriculture credit for 587 projects

6 years ago
Bayelsa, Imo, Kogi guber: Jonathan calls for violence-free election

Jonathan mourns late Ondo Governor Akeredolu

2 years ago

Popular News

    Connect with us

    • Home
    • About
    • Contact
    • Terms of use
    Email Us: publisher@thescript.com.ng

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    No Result
    View All Result
    • Home
    • International News
    • Local
    • Press Release
    • Economy
    • Crime
    • Business and Finance
    • Guest Column
    • Education

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    Welcome Back!

    Login to your account below

    Forgotten Password?

    Retrieve your password

    Please enter your username or email address to reset your password.

    Log In
    This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.