ADVERTISEMENT
  • Home
  • About us
  • Contact us
Friday, December 5, 2025
TheScript Nigeria
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
TheScript Nigeria
No Result
View All Result
Home Press Release

Vandals damage towers T133 and T136 along 330kv Shiroro – Kaduna lines 1 & 2

thescript by thescript
October 18, 2024
in Press Release
0 0
0
Power Sector records new National peak of 5,222.3MW, Clear Stranded Equipment Containers at the Ports
0
SHARES
1
VIEWS
Share on FacebookShare on Twitter

The Transmission Company of Nigeria (TCN) announces that two towers along its 330kV Shiroro–Kaduna transmission lines one and two have been vandalized, damaging parts of both transmission lines.

According to reports from the Shiroro Regional office of TCN, the 330kV transmission line one tripped first, followed shortly by the second, as efforts were still ongoing to reclose the first line, prompting the urgent mobilization of local vigilantes to patrol the lines. This led to the discovery of two damaged towers, towers T133 and tower T 136, with their cables badly damaged at several points.

Arrangements are in top gear to deploy the newly procured “emergency restoration system” to the site, pending the reconstruction of the damaged towers. TCN has also conducted an aerial survey in collaboration with security operatives, given the area’s vulnerability to banditry, which poses a significant threat to both TCN installations and personnel.

In the interim, our engineers have implemented a temporary measure to supply bulk power to the Kaduna and Kano regions via the 330kV Kaduna – Jos transmission line.

The vandalized Shiroro – Kaduna 330kV lines 1&2 are vital lines through which bulk power is transmitted to parts of the North West region, with each line capable of carrying 600MW. The vandalism of the towers and transmission lines presents a significant challenge to bulk power transmission in that axis. We are however committed to re-erecting the towers and restringing the transmission lines to restore bulk power transmission through both 330kV power transmission lines.

Ndidi Mbah
GM, Public Affairs
18/10/24

Recommended

NIMASA

Fair Treatment of Seafarers Must Remain a Priority – Transport Minister

4 years ago
OKOWA

Asaba Declaration: We owe no apologies on open grazing, restructuring – Okowa

5 years ago

Popular News

    Connect with us

    • Home
    • About
    • Contact
    • Terms of use
    Email Us: publisher@thescript.com.ng

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    No Result
    View All Result
    • Home
    • International News
    • Local
    • Press Release
    • Economy
    • Crime
    • Business and Finance
    • Guest Column
    • Education

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    Welcome Back!

    Login to your account below

    Forgotten Password?

    Retrieve your password

    Please enter your username or email address to reset your password.

    Log In
    This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.