ADVERTISEMENT
  • Home
  • About us
  • Contact us
Tuesday, June 17, 2025
TheScript Nigeria
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
TheScript Nigeria
No Result
View All Result
Home National

Arcing on Benin-Egbin 330KV Isolator at Egbin Transmission Substation Did Not Cause System Collapse

thescript by thescript
August 6, 2024
in National
0 0
0
Power Sector records new National peak of 5,222.3MW, Clear Stranded Equipment Containers at the Ports
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

The Transmission Company of Nigeria (TCN), hereby notes that at about 6:10pm yesterday, 5th August 2024, power supply was restored to areas that had been affected by the arcing on the Benin-Egbin 330kV isolator which caused lines tripping and consequent loss of supply to some areas. However, contrary to media reports, the incident did not cause a system collapse.

The lines tripping started earlier at about 2:47 p.m. yesterday, with a heavy system surge that led to the arcing of Benin – Egbin 330kV line isolator fingers at the Egbin Transmission Substation switchyard. This resulted in a tripping at the Egbin Generating Station, which caused the loss of power supply to all the Egbin Transmission Substations’ outgoing lines. This led to an exponential increase in load on the Osogbo-Ihovbor 330kV line 1 with serious arcing of isolator terminals on the Osogbo-Ihovbor 330kV line 1. To ensure that the sequence of events does not affect the nation’s grid, the Osogbo – Ihovbor 330kV line was opened to temporarily cut off the flow of electricity on that line.

At about 2:56pm, however, the Benin-Egbin 330kV line 1 Circuit Breaker also tripped at the Benin Transmission Substation end and this resulted in the loss of supply to Lagos axis, parts of the South West Region, parts of the North Central and Abuja. Meanwhile, other areas, including the South Eastern region, North East, and other parts of North Central and South West, had full power supply.

The line tripping was quickly rectified, enabling the grid controller to restore full bulk power supply through the transmission lines at about 6.10pm yesterday.

Ndidi Mbah
GM, Public Affairs
6th August, 2024

Recommended

ITALY

Financial Crimes: EFCC to Strengthen Cooperation with Italy

6 years ago
Bawa Charges Youths to Brace Up for National Development

Bawa Charges Youths to Brace Up for National Development

2 years ago

Popular News

    Connect with us

    • Home
    • About
    • Contact
    • Terms of use
    Email Us: publisher@thescript.com.ng

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    No Result
    View All Result
    • Home
    • International News
    • Local
    • Press Release
    • Economy
    • Crime
    • Business and Finance
    • Guest Column
    • Education

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    Welcome Back!

    Login to your account below

    Forgotten Password?

    Retrieve your password

    Please enter your username or email address to reset your password.

    Log In
    This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.