ADVERTISEMENT
  • Home
  • About us
  • Contact us
Saturday, May 17, 2025
TheScript Nigeria
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
  • Home
  • International News
  • Local
  • Press Release
  • Economy
  • Crime
  • Business and Finance
  • Education
  • Guest Column
No Result
View All Result
TheScript Nigeria
No Result
View All Result
Home Local

Orere bridge signposts Oborevwori’s equal opportunity for all – Izeze

thescript by thescript
January 26, 2024
in Local
0 0
0
Orere bridge signposts Oborevwori’s equal opportunity for all – Izeze

Commissioner for Works (Highways and Urban Roads), Comrade Izeze Reuben (2nd left) addressing journalists shortly after inspecting the multi billion naira Orere bridge under construction in Ughelli South Local Government Area on Thursday .With him are the Managing Director, Obakpor Engineering Limited, Olorogun John Oguma (left), Director of Highways, Ministry of Works, Engr. Mrs Juliet Aboloje (2nd right), Engr. Anderson Ejovi (3rd right) and Others. PIX: SAMUEL JIBUNOR.

0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

Delta State Government, Thursday, said the ongoing construction of Orere bridge in Ughelli South Local Government Area of the state signifies Governor Sheriff Oborevwori’s opportunities for all Deltans as enshrined in his MORE Agenda.

The State Commissioner for Works (Highways and Urban Roads), Comrade Reuben Izeze disclosed this while speaking to journalists shortly after inspection of ongoing construction works at Orere bridge.

He commended the contracting firm, Obakpor Engineering Limited, an indigenous company for the job done so far on the project and assured that the Governor Oborevwori’s administration would patronise contractors with proven competence and capacity to deliver on projects.

Commissioner for Works, (Highways and Urban Roads) Comrade Izeze Reuben (2nd right) accompanied by  Director,  Highways, Ministry of Works, Engr. Mrs Juliet Aboloje(2nd left), Engr. Anderson Ejovi (3rd left) and others on top of the  multi-billion naira Orere bridge under construction in Ughelli South LGA as he inspects the project on Thursday. PIX: SAMUEL JIBUNOR.

While reiterating the importance of the project to the several communities across the Orere river, Comrade Izeze a former member representing Ughelli South Constituency, commended the state government for awarding the project.

He said: “I am very pleased with this project, the famous Orere bridge because its something I advocated for over the years.

“Let me state very unequivocally that I am very impressed with what I am seeing on ground considering the fact that the contracting firm, Obakpor Engineering before now has been one of those companies that has been alleged to cut corners, not having the professionalism to deliver on projects.

Commissioner for Works (Highways and Urban Roads) Comrade Izeze Reuben (2nd right) inspecting Work on the  multi-billion naira Orere bridge under construction in Ughelli South  LGA on Thursday. With him are Olorogun John Oguma (right), Director Highways Ministry of Works, Engr. Mrs Juliet Aboloje(2nd left), Engr. Anderson Ejovi (left) and Others. PIX: SAMUEL JIBUNOR. 

“But here we are standing across the project that is being handled by Obakpor Engineering and you will think that you are standing at the Trans-Warri Ode-Itsekiri bridges that is being handled by a foreign firm.

“What he has done so far is that he is bridging the gap between our indigenous contractors and their foreign counterparts..

“One of the cardinal legs upon which the MORE Agenda of Governor Sheriff Oborevwori stands is ‘Opportunities for all’ and it means everybody would have the opportunity to prove themselves.

“The quality of your work will determine how much patronage you will receive from government. I can say categorically that Obakpor Engineering has improved tremendously in terms of the manpower and equipment.

“The contractor has said he will be out of site completely within the next nine months and this goes to show that Obakpor Engineering has come of age and they will continue to improve as we move forward. It is a fantastic job but like I will always say, there is room for improvement.”

On the length of the bridge before the river, Izeze explained that the bridge was designed to ensure that high flood waters does not impede usage of the bridge when there is flood around the corridor.

“If you understand this terrain, the over 30 communities that make up the Ewu Kingdom in Ughelli South is entirely an Island and they don’t need much rains before the flood starts.

“To get the proper sloping, the bridge is designed such that there is enough distance before the river so that by the time flooding starts it will not disturb the usage of this bridge,” Izeze said.

Commissioner for Works (Highways and Urban Roads) Comrade Izeze Reuben (3rd right), pointing at the top of the  multi-billion naira Orere bridge under construction in Ughelli South Local Government Area during his inspection of the project on Thursday.  With him are the  MD, Obakpor Engineering Limited, Olorogun John Oguma (2nd right) and the Senior Special Assistant to the Governor on Media, Comrade Nelson Egware (right). PIX: SAMUEL JIBUNOR.

On her part, the State Director of Highways, Engr. Mrs Juliet Aboloje said the Orere bridge is 500m cutting across 25 spans of 20meters each with access road of 4.3km and 1.36km arterial roads.

Managing Director of Obakpor Engineering Limited, Olorogun John Oguma said the company remains committed to completing the project on target.

He said the project was delayed by yearly flooding that makes the firm to lose four months of active work annually.

“The taste of the pudding is in the eating. We are trying our best as one of the best indigenous contractors around the state to ensure that we deliver the best quality roads and bridges for our dear state.

“What you are seeing here started in 2021 but God willing we will finish the decking by February to March ending then we will thereafter face the access road.

“By the grace of God this place will be fully motorable and we will open this bridge to the remaining 15 communities up to Bomadi.

“We can assure that in the next nine months we will be through with the job and I thank the state government for trusting us with this all important project.”

PRESS UNIT,
GOVT.HOUSE, ASABA 

Recommended

EESYEGLASS

Here’s why you’re getting headaches after wearing new glasses

5 years ago
buhari

President Buhari Felicitates with Alhaji Bawa Garba on 80th Birthday

3 years ago

Popular News

    Connect with us

    • Home
    • About
    • Contact
    • Terms of use
    Email Us: publisher@thescript.com.ng

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    No Result
    View All Result
    • Home
    • International News
    • Local
    • Press Release
    • Economy
    • Crime
    • Business and Finance
    • Guest Column
    • Education

    © 2021 TheScript Nigeria -Providing quality news and information that improves the quality of life.

    Welcome Back!

    Login to your account below

    Forgotten Password?

    Retrieve your password

    Please enter your username or email address to reset your password.

    Log In
    This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.